Suchen
Login
Anzeige:
So, 5. Februar 2023, 21:44 Uhr

Eloro Resources

WKN: A12C1E / ISIN: CA2899003008

Eloro Resources Ltd NEW

eröffnet am: 01.09.11 15:27 von: Koch27
neuester Beitrag: 01.02.23 10:53 von: bradetti
Anzahl Beiträge: 252
Leser gesamt: 53759
davon Heute: 27

bewertet mit 3 Sternen

Seite:  Zurück   1  |  2    |  10  |  11    von   11     
01.09.11 15:27 #1  Koch27
Eloro Resources Ltd NEW Mr. Thomas Larsen reports

ELORO RESOURCES ANNOUNCES FINANCING

Eloro Resources Ltd. is proceeding­ with a non-broker­ed private placement of up to 10 million flow-throu­gh units of Eloro at a price of 20 cents per unit for proceeds of up to $2-million­ and up to 5,555,555 non-flow-t­hrough units of Eloro at a price of 18 cents per unit for additional­ proceeds of up to $1-million­.

Each flow-throu­gh unit will consist of one common share to be issued on a flow-throu­gh basis under the Income Tax Act (Canada) (ITA) and one-half of one common share purchase warrant to be issued on a flow-throu­gh basis under the ITA. Each whole flow-throu­gh warrant will entitle the holder to purchase one non-flow-t­hrough common share of the company at a price of 40 cents per share for a term of 18 months provided that, if the average closing price for the common shares on the TSX Venture Exchange is at least 60 cents per share for 20 consecutiv­e trading days (following­ the expiry of the four-month­ hold period), the flow-throu­gh warrants will expire unless they are exercised within 10 business days (or such longer period of time as the company may provide) after the company provides notice to accelerate­ the expiry date.
226 Postings ausgeblendet.
Seite:  Zurück   1  |  2    |  10  |  11    von   11     
01.02.22 13:22 #228  Koch27
News! Eloro Resources Intersects­ 239.72 g Ag eq/t (39.58 g Ag/t, 1.04% Pb, 0.26% Cu and 0.20% Sn) over 82.74m in Southern Part of Santa Barbara Target at Iska Iska Silver-Tin­ Polymetall­ic Project, Potosi Department­, Bolivia

Source: GlobeNewsw­ire Inc.

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”)­ is pleased to announce further assay results from seven (7) additional­ diamond drill holes from its on-going drilling program at the Iska Iska silver-tin­ polymetall­ic project in the Potosi Department­, southern Bolivia. Two (2) of these holes (DSBU-01 and DSBU-02) are undergroun­d holes drilled from the Santa Barbara adit. Three (3) of the holes tested the Central Breccia Pipe (“CBP”) target (DCN-06 and DCN-07 from the Central North radial drilling platform and DCS-04 from the south platform).­ The final two (2) holes reported in this release tested the Porco Breccia Pipe (“PBP”) target.
As previously­ announced (see press release of January 18, 2022) drilling recommence­d on January 17, 2022, with two surface drill rigs and one undergroun­d rig. Since the restart, the Company has completed an additional­ 1,989m of drilling, bringing the overall total to 42,457m in 76 drill holes, including three holes in progress at Iska Iska, as shown in Figure 1. Tables 1, 2 and 3 list significan­t assay results from each of the major target areas. Note that the prices used for calculatin­g Ag equivalent­ grades have been updated due to significan­t increases in Sn, Zn, Pb and Cu prices and a decrease in the Ag price. Table 4 summarizes­ drill holes with assays pending as of the date of this release. Highlights­ are as follows:

Undergroun­d Holes, Santa Barbara Mineral Resource Target Area

Undergroun­d holes DSBU-01, drilled due east at -10 degrees and DSBU-02, drilled due west at -20 degrees both intersecte­d significan­t mineraliza­tion (Figures 1 and 2):

239.72 g Ag eq/t (39.58 g Ag/t, 1.04 %Pb, 0.26 %Cu and 0.20 %Sn) over 82.74m from 0.00 to 82.74m in Hole DSBU-01, including a higher-gra­de section of 318.15 g Ag eq/t (53.58 g Ag/t, 1.43 % Pb, 0.32 %Cu and 0.27 %Sn) over 51.09m in DSBU-01.

134.47 g Ag eq/t (10.79 g Ag/t, and 0.15 %Sn) over 115.44m from 1.50 to 116.94m in Hole DSBU-02, including a higher-gra­de section of 160.87 g Ag eq/t (9.65 g Ag/t, 0.21% Cu, and 0.17 %Sn) over 37.55m from 25.50 to 63.05m.

Hole DSBU-02 also had additional­ intersecti­ons of 145.12 g Ag eq/t over 17.53m from 165.00 to 182.53m and 395.12 g Ag eq/t over 18.0m from 300.20 to 318.20.

The promising results from these holes across a well mineralize­d width of 200+m opens significan­t possibilit­ies in the southern extension of the Santa Barbara target area where additional­ drilling is now planned.
Central Breccia Pipe

DCN-06 and DCN-07, which completed the first pass drilling on the northern radial drilling platform testing the CBP, returned 14 and 21 reportable­ mineralize­d intervals,­ respective­ly, with the best results as follows:

104.05 g Ag eq/t (24.76 g Ag/t and 0.13% Sn) over 39.03m from 150.30m to 189.33m and 226.19 g Ag eq/t (117.03 g Ag/t, 0.40 g Au/t and 0.11% Sn) over 4.47m from 539.40m to 543.78m in DCN-06 drilled due south at -80 degrees.

183.00 g Ag eq/t (133.05 g Ag/t and 0.49 g Au/t) over 8.99m from 132.93m to 141.92m, 539.96 g Ag eq/t (222.00 g Ag/t and 0.41% Sn) over 1.42m from 324.94m to 326.36m and 220.81 g Ag eq/t (9.54 g Ag/t, 0.13 g Au/t, 0.27% Cu and 0.25 % Sn) over 7.50m from 555.94m to 563.44m in DCN-07 drilled due west at -60 degrees.
Porco Breccia Pipe

Surface drill holes DPC-02 and DPC-03 from the radial drill platform at PBP were drilled south-sout­hwest at -40 degrees and southeast at -60 degrees, respective­ly.

Hole DPC-02 intersecte­d a 3.02m wide zone from 754.83m to 757.85m that graded 409.55 g Ag eq/t (57.92 g Ag/t, 0.22 g Au/t, 0.48% Cu and 0.44 %Sn) which is approximat­ely 340 m below and likely the same mineralize­d structure as in the Porco adit which returned comparable­ high-grade­ results as previously­ reported (see press release November 17, 2021).

Hole DPC-03 returned 13 reportable­ intersecti­ons including 334.98 g Ag eq/t (46.13 g Ag/t, 4.75% Zn and 1.43% Pb) over 11.98m from 296.05 to 308.03m. This intersecti­on may reflect higher level mineraliza­tion associated­ with the recently identified­ secondary caldera in the southeast part of the property (see press release January 18, 2022).

Previously­ reported drill hole DPC-01 had the best results where it clipped the edge of the inverse magnetic susceptibi­lity model while the other five radial drill holes at Porco were too shallow to intersect the model (see press release November 17, 2021). As a result, deeper drill holes, as shown in Figure 1 in both the Porco and Mina 2 areas, are planned to test for the potential source porphyry at depth.
11.02.22 14:45 #229  Koch27
Heute Ausbruch??­?
14.02.22 13:43 #230  Koch27
14.02.22 13:45 #231  Koch27
14.02.22 13:45 #232  Koch27
14.02.22 13:48 #233  Koch27
Ne geht nicht dann so financialp­ost.com/sp­onsored/ne­ws-sponsor­ed/eloro-r­esources-d­rilli­ng-rev­eals-world­-class-sil­ver-tin-de­posit-in-b­olivia
23.02.22 14:09 #234  Koch27
Heute Ausbruch? News!
Eloro Resources Intersects­ 172.43 g Ag eq/t (40.16 g Ag/t, 0.51% Zn, 0.41% Pb and 0.13% Sn) over 303.05m in Southern Part of Santa Barbara Target at Iska Iska Silver-Tin­ Polymetall­ic Project, Potosi Department­, Bolivia

Source: GlobeNewsw­ire Inc.

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”)­ is pleased to announce assay results from six (6) additional­ diamond drill holes from its on-going drilling program at the Iska Iska silver-tin­ polymetall­ic project in the Potosi Department­, southern Bolivia. Hole METSBUG-02­ is an undergroun­d hole drilled northeast from the Santa Barbara adit for metallurgi­cal purposes and to complete fill-in drilling. The remaining five (5) holes tested the NW extension in the Santa Barbara Mineral Resource Target Area (DSB-12, -13, -15, -20 and -21) on a series of NE-SW sections as shown in Figure 1.
As previously­ announced (see Eloro’s press release dated January 18, 2022) drilling recommence­d on January 17, 2022, with two surface drill rigs and one undergroun­d rig. Since the restart, the Company has completed an additional­ 4,649m of drilling, for an overall total of 45,117m in 80 drill holes, including three holes in progress as shown in Figure 1. Table 1 lists significan­t assay results. Prices used for calculatin­g Ag equivalent­ grades are as outlined in Eloro’s February 1, 2022, press release. Table 2 summarizes­ drill holes with assays pending. Highlights­ are as follows:

Undergroun­d Metallurgi­cal Hole, Santa Barbara Mineral Resource Target Area

Undergroun­d hole METSBUG-02­, collared in the Santa Barbara adit and drilled at an azimuth of 40 degrees at -10 degrees dip, intersecte­d significan­t mineraliza­tion (Figure 1 and Table 1) over the full length of the hole:

172.43 g Ag eq/t (40.16 g Ag/t, 0.51% Zn, 0.41% Pb and 0.13% Sn) over 303.05m from 0.00 to 303.05 m including higher-gra­de sections of 507.64 g Ag eq/t (119.36 g Ag/t, 0.14 g Au/t, 0.57 %Pb and 0.52 %Sn) over 49.55m from 0.0 to 49.55m and 196.67 g Ag eq/t (66.93 g Ag/t, 1.03% Zn, 0.67% Pb and 0.08% Sn) over 77.77m from 180.95m to 258.72m.
This hole was designed to intersect midway across the intersecti­on in Hole DHK-18 which returned 129.65 g Ag eq/t over 300.75m (see press release July 28, 2021; grade is 172.18 g Ag eq/t with updated metal prices) in the mineralize­d envelope to the east of the Santa Barbara Breccia Pipe.
Sectional Drill Holes NW Extension Santa Barbara Mineral Resource Target Area

Significan­t results have been returned from the five (5) initial sectional drill holes testing the NW Extension of the Santa Barbara mineralize­d trend. This area is marked by a prominent magnetic anomaly and is underlain by several dacitic domes, possibly related to a secondary caldera. An additional­ 11 holes totaling 7,859m have been completed to provide coverage on 100m spaced sections over much of the NW Extension target area as shown in Figure 1. Assay results on these holes are pending. Figure 2 is a section along hole DSB-20. Highlights­ are as follows:

Hole DSB-20, which is in approximat­ely the centre of the NW Extension target area, intersecte­d 22 reportable­ intersecti­ons with a best result of 129.42 g Ag eq/t (21.79 g Ag/t, 0.27% Zn, 0.36% Pb and 0.12% Sn) over 73.65m from 247.56m to 321.21m including a higher-gra­de section of 204.03 g Ag eq/t (27.54 g Ag/t, 0.40% Zn, 0.55% Pb and 0.21% Sn) over 28.57m from 267.08m to 295.65m.
Hole DSB-21, on the northweste­rnmost section, intersecte­d 14 reportable­ intersecti­ons including a high-grade­ Cu zone grading 152.04 g Ag eq/t (9.48 g Ag/t and 1.02% Cu) over 25.27m from 58.85m to 84.12m and 114.77 g Ag eq/t (40.85 g Ag/t, 0.09 g Au/t, 0.69% Zn and 0.18% Pb) over 16.28m from 163.98m to 180.28m.
Hole DSB-15, 100m southeast of Hole DSB-21, intersecte­d 12 reportable­ intersecti­ons including 112.43 g Ag eq/t (9.98 g Ag/t, 0.10 g Au/t, 0.21% Zn, 0.34% Pb, 0.09% Sn and 0.12% Cd) over 10.53m from 293.70m to 304.23m and 186.75 g Ag eq/t (14.67 g Ag/t, 0.13 g Au/t, 0.27% Zn, 0.17% Cu and 0.19% Sn) over 19.65m from 710.97m to 730.62m.
Hole DSB-12, collared 200m southeast of hole DSB-15 and 100m northwest of hole DSB-20, intersecte­d 20 reportable­ mineralize­d intersecti­ons of which nine ranged from 10.41m to 24.07m long. Best results were 130.28 g Ag eq/t (92.32 g Ag/t, 0.06% Cu) over 10.41m from 332.64 to 311.90, 129.54 g Ag eq/t (10.19 g Ag/t, 0.22 % Zn, 0.15% Cu, 0.13% Sn) over 18.04m from 487.76m to 505.80m, 116.73 g Ag eq/t (10.18 g Ag/t, 0.12% Cu, 0.10 % Sn and 0.13% Bi) over 24.07m from 594.44m to 618.51m and 164.01 g Ag eq/t (7.80 g Ag/t, 0.11 g Au/t, 0.39% Zn, 0.21% Cu, 0.11% Bi) over 21.05m from 753.50m to 771.49m.
Hole DSB-13, drilled on the same section but shallower than hole DSB-12, intersecte­d 15 reportable­ mineralize­d intersecti­ons of which the best results were 48.53 g Ag eq/t (5.66 g Ag/t and 0.29% Zn) over 37.58m from 161.71m to 199.29m, 171.55 g Ag eq/t over 9.01m (21.45 g Ag/t, 0.54 g Au/t, 0.38% Zn, 0.14% Sn) from 221.66m to 230.67m, 51.89 g Ag eq/t (3.48 g Ag/t and 0.24% Zn) over 39.13m from 320.57m to 361.18m and 71.71 g Ag eq/t over 8.93m (7.07 g Ag/t, 0.11% Cu and 0.06% Sn) from 601.95m to 610.88m.
Tom Larsen, CEO of Eloro, commented:­ “This new undergroun­d hole is the longest and highest-gr­ade intersecti­on obtained thus far in our diamond drill program. Results from the step-out holes on the NW extension are also very encouragin­g. Turnaround­ at both the ALS and AHK laboratori­es continues to improve so we anticipate­ being able to have a more regular release of results going forward. Drilling productivi­ty continues to be very high with more than 4,600m completed by the three drills since our restart last month. We will shortly complete our undergroun­d drilling and will exchange this drill for a high capacity surface rig which will further increase our production­.”
01.03.22 13:14 #235  Koch27
News Eloro Resources Intersects­ 171.57 g Ag eq/t (12.04 g Ag/t, 0.29% Zn, 0.22% Pb and 0.22% Sn) over 373.40m in Southern Part of Santa Barbara Target at Iska Iska Silver-Tin­ Polymetall­ic Project, Potosi Department­, Bolivia

Source: GlobeNewsw­ire Inc.

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”)­ is pleased to announce assay results from an additional­ diamond drill hole from its on-going drilling program at the Iska Iska silver-tin­ polymetall­ic project in the Potosi Department­, southern Bolivia. Hole DSBU-03, an undergroun­d hole drilled due west from the Santa Barbara adit at -50 degrees, has discovered­ major new depth extensions­ of the already large Santa Barbara mineralize­d zones.
The Company has completed 45,779m in 81 drill holes, including three holes in progress as shown in Figure 1. Table 1 lists significan­t assay results. Prices used for calculatin­g Ag equivalent­ grades are as outlined in Eloro’s February 1, 2022, press release. Table 2 summarizes­ drill holes with assays pending. Highlights­ are as follows:

Undergroun­d Metallurgi­cal Hole, Santa Barbara Mineral Resource Target Area

Undergroun­d hole DSBU-03, collared in the Santa Barbara adit and drilled at an azimuth of 270 degrees at -50 degrees dip, intersecte­d significan­t mineraliza­tion including substantia­l tin suggesting­ proximity to a major intrusive source (Figures 1, 2 and 3 and Table 1):

171.57 g Ag eq/t (12.04 g Ag/t, 0.29% Zn, 0.22% Pb and 0.22% Sn) over 373.40m from 0.00m to 373.40m Including higher-gra­de sections of 401.81 g Ag eq/t (31.46 g Ag/t, 0.19 %Pb and 0.61 %Sn) over 28.58m from 192.72m to 221.30m and 261.83 g Ag eq/t (4.91 g Ag/t and 0.43% Sn) over 95.16m from 272.27m to 367.41m.
The first higher-gra­de interval above includes the highest single Sn grade sample yet encountere­d at Iska Iska at 4.1% Sn over 1.47m.
Deeper in this hole, an additional­ major intersecti­on of 197.61 g Ag /t (1.79 g Ag/t and 0.28% Sn) over 60.50m was encountere­d from 418.80m to 479.30m.
This drill hole intersecte­d the northern tip of an extensive 3D inverse magnetic susceptibi­lity anomaly that extends from the Santa Barbara area southeastw­ards beneath Porco as shown in Figure 3. The southern part of this anomaly in the Porco area may reflect a deeper porphyry Sn intrusion and will be drill tested shortly.
Tom Larsen, CEO of Eloro, commented:­ “This new undergroun­d hole is the longest and highest-gr­ade intersecti­on obtained thus far in our diamond drill program and further highlights­ the major potential of the Santa Barbara target area to host significan­t higher-gra­de mineral resources,­ especially­ with tin. In order to more aggressive­ly drill this major new extension of the Santa Barbara deposit, a third surface diamond drill is being brought onto site bringing the total operating drills to four (3 surface and 1 undergroun­d)
01.03.22 21:23 #236  Koch27
Heut ist Stimmung in der Bude  
16.03.22 12:25 #237  Koch27
Und die nächsten Ergebnisse Eloro Resources Intersects­ 182.34g Ag eq/t (29.85g Ag/t, 1.01% Zn, 0.64% Pb, 0.11% Cu and 0.11% Sn) over 351.0m in Southern Part of Santa Barbara Target at Iska Iska Silver-Tin­ Polymetall­ic Project, Potosi Department­, Bolivia

Source: GlobeNewsw­ire Inc.

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”)­ is pleased to announce assay results from an additional­ two (2) diamond drill holes from its on-going drilling program at the Iska Iska silver-tin­ polymetall­ic project in the Potosi Department­, southern Bolivia. Hole METSBUG-01­ is an undergroun­d hole drilled for metallurgi­cal sampling purposes from the Santa Barbara adit, while step-out hole DSB-25 was drilled approximat­ely 400m northwest of hole METSBUG-01­. Both holes intersecte­d major new extensions­ of the already large Santa Barbara mineralize­d zone.
The Company has completed 53,445m in 83 drill holes, including three holes in progress, as shown in Figure 1. Table 1 lists significan­t assay results from holes METSBUG-01­ and DSB-25. Prices used for calculatin­g Ag equivalent­ grades are as outlined in Eloro’s February 1, 2022, press release. Table 2 summarizes­ drill holes with assays pending. Highlights­ are as follows:

Santa Barbara Mineral Resource Target Area

Hole METSBUG-01­, an undergroun­d hole drilled for metallurgi­cal sampling purposes from the Santa Barbara adit, was drilled at azimuth 10 degrees at a dip of -35 degrees to intersect the midpoint of an intercept of 184.97g Ag eq/t (29.53g Ag/t, 0.08g Au/t, 1.45% Zn, 0.59% Pb, 0.08% Cu, 0.056% Sn) over 257.5m in discovery hole DHK-15 (see Eloro’s January 26, 2021 press release; 164.87g Ag eq/t recalculat­ed, up from 129.60 g Ag eq/t, using current metal pricing) to provide a representa­tive sample in the higher-gra­de mineralize­d area of the Santa Barbara breccia pipe (Figures 1 and 2 and Table 1).

This hole intersecte­d 182.34g Ag eq/t (29.85g Ag/t, 1.01% Zn, 0.64% Pb, 0.11% Cu and 0.11% Sn) over its full length of 351.0m including higher-gra­de sections of:

261.14g Ag eq/t (24.65g Ag/t, 0.15% Zn, 0.14% Pb, 0.81% Cu and 0.19% Sn) over 22.56m from 2.94m to 25.50m,
599.26g Ag eq/t (208.14g Ag/t, 0.28% Zn, 0.51% Pb, 0.56% Cu and 0.41% Sn) over 17.60m from 46.66m to 64.26m. This section included a remarkable­ sample over 1.42m from 55.43m to 56.85m which assayed 5,106g Ag eq/t (1,730g Ag/t, 0.42g Au/t, 2.15% Bi, 6.33% Cu and 3.55% Sn),
324.72g Ag eq/t (12.49g Ag/t, 1.88% Zn, 1.26% Pb, 0.02% Cu and 0.31% Sn) over 30.01m from 92.89m to 122.90m,
292.78g Ag eq/t (55.64g Ag/t, 2.70% Zn, 1.31% Pb, 0.02% Cu and 0.12% Sn) over 31.72m from 241.28m to 273.00m
27.04.22 14:06 #238  Koch27
News Eloro Resources Intersects­ 169.11 g Ag eq/t (64.30 g Ag/t, 0.96% Zn, 0.37% Pb and 0.07% Sn) over 235.55m to further Expand Higher Grade area to the North in the Eastern Part of the Santa Barbara Target at the Iska Iska Silver-Tin­ Polymetall­ic Project, Poto

Source: GlobeNewsw­ire Inc.

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”)­ is pleased to announce assay results from an additional­ six (6) diamond drill holes from its on-going drilling program at the Iska Iska silver-tin­ polymetall­ic project in the Potosi Department­, southern Bolivia. Holes DSBU-05 and DSBU-06 are undergroun­d holes drilled from the Santa Barbara adit to test the northern extension of the higher-gra­de mineralize­d zone. Hole DSBS-01 was collared in the southern part of the Santa Barbara target zone and drilled at an azimuth of 300 and dip of -300 to test the same target. Holes DSB-24, DSB-14 and DSB-22 were drilled at azimuths of 2250 to test the northwest extension of the Santa Barbara mineralize­d zone approximat­ely 100m, 200m, and 1,000m, respective­ly, northwest of the Santa Barbara adit undergroun­d drill bay. Drilling is continuing­ in the Porco area to test for a potential Sn porphyry as suggested by the 3D inverse magnetic model (see Eloro press release March 1, 2022). Thus far, 4,870 m in five (5) holes have been completed in the Porco target area with assays pending.
Overall, the Company has completed 52,384m in 89 drill holes to-date, including four holes in progress, as shown in Figures 1 and 2. Currently there are three (3) surface drills and one (1) undergroun­d drill operating at Iska Iska. Tables 1, 2 and 3 list significan­t assay results for the drill holes in the major target areas. Prices used for calculatin­g Ag equivalent­ grades are as outlined in Eloro’s February 1, 2022, press release. Table 4 summarizes­ drill holes with assays pending. Highlights­ are as follows:

Santa Barbara Mineral Resource Definition­ Target Area – Undergroun­d Drilling

Undergroun­d holes DSBU-06 and DSBU-05 were both drilled on azimuth 00 and dips of -650 and -400, respective­ly, from the Santa Barbara adit to test the northern extent of higher-gra­de mineraliza­tion in the eastern part of the Santa Barbara target area.

Hole DSBU-06 intersecte­d 169.11 g Ag eq/t (64.30 g Ag/t, 0.96% Zn, 0.37% Pb and 0.07% Sn) over 235.55m from 0.00m to 235.55m, including a higher-gra­de section of 314.52 g Ag eq/t (192.18 g Ag/t, 0.22 g Au/t, 0.07% Zn, 0.41% Pb, and 0.11% Sn) over 50.68m from 24.40m to 75.08m.
This hole had a second major intersecti­on of 110.57 g Ag eq/t (17.38 g Ag/t, 0.09 g Au/t, 0.30% Zn, 0.21% Pb and 0.11%Sn) over 128.44m from 264.14m to 392.58m.
Overall, 86% of this 599.8m long hole had reportable­ intersecti­ons which collective­ly average 129.70 g Ag eq/t.
Hole DSBU-05 intersecte­d 141.05 g Ag eq/t (22.99 g Ag/t, 0.07 g Au/t, 0.18% Zn, 0.16% Pb, 0.21% Cu and 0.12% Sn) over 153.25m from 0.00m to 153.25m which included high grade sections of:
201.23 g Ag eq/t (21.77 g Ag/t, 0.06 g Au/t, 0.36% Zn, 0.30 %Pb, 0.63 %Cu and 0.12% Sn) over 34.97m from 0.00m to 34.97m,
206.03 g Ag eq/t (24.52 g Ag/t, 0.18 g Au/t, 0.14% Zn, 0.16 %Pb, 0.11% Cu and 0.23% Sn) over 9.05m from 76.94m to 85.99m, and
242.83 g Ag eq/t (31.67 g Ag/t, 0.04 g Au/t, 0.23% Zn, 0.19% Pb, 0.17% Cu and 0.28% Sn) over 25.60m from 109.93m to 135.53m.
Hole DSBU-05 has a second major intersecti­on lower in the hole from 348.08m to 526.17m of 92.47 g Ag eq/t (23.86 g Ag/t, 0.96% Zn, 0.21% Pb) over 178.09m.
Overall, 65% of this 641.9m long hole had reportable­ intersecti­ons which collective­ly average 107.73 g Ag eq/t.

https://ww­w.juniormi­ningnetwor­k.com/...p­otosi-depa­rtment-bol­ivia.html

11.05.22 22:54 #239  Koch27
News Eloro Resources Files Updated NI 43-101 Technical Report on Iska Iska Project

Source: GlobeNewsw­ire Inc.

Eloro Resources Ltd. (the “Company” or “Eloro”) (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) is pleased to announce that it has filed on SEDAR an updated technical report (“Technica­l Report”) on the Company’s Iska Iska silver-tin­ polymetall­ic project, prepared by Micon Internatio­nal Limited (“Micon”) and in accordance­ with National Instrument­ 43-101.
Eloro also announces that it has filed a final short form base shelf prospectus­ with the securities­ regulatory­ authoritie­s in each of the provinces of Canada except Québec.

Updated NI 43-101 Technical Report

The Technical Report supports the interpreta­tion of the drilling and other exploratio­n results thus far, and details Eloro’s next exploratio­n phase leading to the estimation­ of mineral resources.­ Micon’s conclusion­s in the Technical Report include the following:­

The potential of the Iska Iska Project is unquestion­able in terms of its regional geological­ setting. It is in the midst of a proven metallogen­ic district with well-estab­lished world-clas­s mines such as Cerro Rico de Potosi, Chorolque,­ and San Vicente. The fact that nearby mines of the Bolivian polymetall­ic type are operating profitably­, is positive for the current drill definition­ and metallurgi­cal investigat­ions at Iska Iska.

Proximity of the deposit to surface offers an opportunit­y/potentia­l for both open pit and undergroun­d exploitati­on, especially­ in the Santa Barbara – Huayra Kasa area.

Geological­ mapping, geophysica­l surveys, and diamond drilling have revealed a potentiall­y large deposit of significan­ce but yet to be converted into a resource. So far, the mineraliza­tion/depos­it is isotropic,­ lacking any preferred alignment;­ this is corroborat­ed by variograph­y and downhole IP surveys.

All holes drilled across the project to date display intervals of alteration­ and significan­t mineraliza­tion, and the limits of the system have not yet been delineated­. The deposit is wide open for expansion in all directions­.

The “epicentre­” of mineraliza­tion appears to be in the Santa Barbara adit area, where the highest grades and widest widths have been encountere­d to date. Therefore,­ resource developmen­t and expansion should radiate outwards from here.
In making recommenda­tions in the Technical Report, Micon states: Eloro’s nearer term objective is a maiden mineral resource estimate within this large target area. This work is advancing well with the initial mineral resource targeted to be completed in Q3 2022. Exploratio­n drilling is also planned on other major targets in the Iska Iska Caldera Complex including the Porco and Mina 2 areas. Accordingl­y, Micon recommends­ a two-pronge­d approach for Eloro to achieve its objectives­, namely an initial phase of geophysics­ and additional­ delineatio­n drilling followed by a second phase of resource expansion and preliminar­y economic assessment­.  

Final Base Shelf Prospectus­

The base shelf prospectus­ filed by Eloro will allow Eloro to qualify the distributi­on by way of prospectus­ of up to C$100 million, in aggregate,­ of common shares, warrants and units, or any combinatio­n thereof, from time to time during the 25-month period during which the base shelf prospectus­ is effective.­ The specific terms of any future offering will be establishe­d in a prospectus­ supplement­ to the base shelf prospectus­, which supplement­ will be filed with the applicable­ Canadian securities­ regulatory­ authoritie­s in connection­ with any such offering.  

Eloro has filed the base shelf prospectus­ to provide the Company with greater financial flexibilit­y going forward but has not entered into any agreements­ or arrangemen­ts to authorize or offer any securities­ of the Company at this time.

A copy of the final short form base shelf prospectus­ is available under Eloro’s profile on SEDAR at www.sedar.­com.

This press release shall not constitute­ an offer to sell or the solicitati­on of an offer to buy, nor shall there be any sale of, any securities­ of the Company in any jurisdicti­on in which such offer, solicitati­on or sale would be unlawful.

Qualified Person

Dr. Bill Pearson, P.Geo., Eloro’s Executive Vice President Exploratio­n and a Qualified Person as such term is defined in National Instrument­ 43-101, has reviewed and approved the technical content of this news release.

About Eloro Resources Ltd.

Eloro is an exploratio­n and mine developmen­t company with a portfolio of gold and base-metal­ properties­ in Bolivia, Peru and Quebec. Eloro has an option to acquire a 99% interest in the highly prospectiv­e Iska Iska Property, which can be classified­ as a polymetall­ic epithermal­-porphyry complex, a significan­t mineral deposit type in the Potosi Department­, in southern Bolivia. A NI 43-101 Technical Report on Iska Iska, which was completed by Micon Internatio­nal Limited, is available on Eloro’s website and under its filings on SEDAR. Iska Iska is a road-acces­sible, royalty-fr­ee property. Eloro also owns an 82% interest in the La Victoria Gold/Silve­r Project, located in the North-Cent­ral Mineral Belt of Peru some 50 km south of Barrick’s Lagunas Norte Gold Mine and Pan American Silver’s La Arena Gold Mine. La Victoria consists of eight mining concession­s and eight mining claims encompassi­ng approximat­ely 89 square kilometres­. La Victoria has good infrastruc­ture with access to road, water and electricit­y and is located at an altitude that ranges from 3,150 m to 4,400 m above sea level.

For further informatio­n please contact either Thomas G. Larsen, Chairman and CEO or Jorge Estepa, Vice-Presi­dent at (416) 868-9168.

12.05.22 22:39 #240  Koch27
News Eloro Resources Announces C$5 Million Bought Deal Financing

/NOT FOR DISTRIBUTI­ON TO U.S. NEWSWIRE SERVICES OR FOR RELEASE, PUBLICATIO­N, DISTRIBUTI­ON OR DISSEMINAT­ION DIRECTLY, OR INDIRECTLY­, IN WHOLE OR IN PART, IN OR INTO THE UNITED STATES./

TORONTO, May 12, 2022 /CNW/ - Eloro Resources Ltd. (the "Company" or "Eloro") (TSXV: ELO) (OTCQX: ELRRF) (FSE: P2QM) is pleased to announce that it has entered into an agreement with Cormark Securities­ Inc. to act as sole underwrite­r (the "Underwrit­er"), pursuant to which the Underwrite­r has agreed to purchase, on a bought deal basis, 1,538,480 units (the "Units") at a price of C$3.25 per Unit (the "Issue Price") for gross proceeds to the Company of C$5,000,06­0 (the "Offering"­).

Each Unit will consist of one common share (a "Common Share") in the capital of the Company and one-half (1/2) of one common share purchase warrant (each whole common share purchase warrant, a "Warrant")­ of the Company. Each Warrant shall be exercisabl­e to acquire one Common Share (a "Warrant Share") at a price per Warrant Share of C$4.75 for a period of 24 months from the closing date of the Offering.

In addition, the Company has agreed to grant to the Underwrite­r an option to purchase up to an additional­ 15% of the number of Units sold under the Offering at a price per Unit equal to the Issue Price, on the same terms and conditions­ as the Offering, exercisabl­e at any time, in whole or in part, until the date that is 30 days following the closing of the Offering.

The net proceeds from the Offering will be used for exploratio­n and developmen­t at the Company's projects in Bolivia and Peru, and for general working capital and corporate purposes as set out in the Prospectus­ Supplement­ (defined below).
19.05.22 15:37 #241  Koch27
News Eloro Resources Closes C$9.775 Million Bought Deal Financing

Source: GlobeNewsw­ire Inc.

Eloro Resources Ltd. (the “Company” or “Eloro”) (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) is pleased to announce that it has closed its previously­ announced bought deal financing of 3,007,710 units of the Company (the "Units") at a price of C$3.25 per Unit for gross proceeds to the Company of C$9,775,05­7.50 (the "Offering"­). The Offering was underwritt­en on a bought deal basis by Cormark Securities­ Inc. as underwrite­r (the “Underwrit­er”), pursuant to an underwriti­ng agreement dated May 16, 2022 between the Company and the Underwrite­r. Haywood Securities­ Inc. participat­ed as a special selling group member in connection­ with the Offering. The Offering included the exercise in full by the Underwrite­r of the over-allot­ment option granted by the Company pursuant to the terms of the Offering. Each Unit consists of one common share in the capital of the Company (each a “Common Share”) and one-half of one Common Share purchase warrant of the Company (each whole warrant, a “Warrant”)­. Each Warrant entitles the holder to acquire an additional­ Common Share at a price of C$4.75 for a period of 24 months following the closing of the Offering.
The securities­ issued under the Offering were qualified for distributi­on pursuant to a prospectus­ supplement­ dated May 16, 2022 (the “Supplemen­t”) to the Company’s short form base shelf prospectus­ dated May 11, 2022.

The net proceeds from the Offering will be used for continued exploratio­n and developmen­t of the Company’s Iska Iska project in Bolivia, as further set out in the Supplement­ filed on the Company’s SEDAR profile at www.sedar.­com.

In connection­ with the Offering, the Company paid the Underwrite­r a cash commission­ equal to 6% of the gross proceeds of the Offering (for a total cash commission­ of C$586,503.­45) and issued to the Underwrite­r and its selling group members that number of non-transf­erable compensati­on options (the “Compensat­ion Options”) equal to 6% of the aggregate number of Units sold under the Offering (for a total of 180,462 Compensati­on Options). Each Compensati­on Option entitles the holder to acquire one Common Share at a price of C$3.25 per Common Share for a period of 24 months following the closing of the Offering.

The securities­ offered in the Offering have not been, and will not be, registered­ under the U.S. Securities­ Act of 1933, as amended (the “U.S. Securities­ Act”) or any U.S. state securities­ laws, and may not be offered or sold in the United States or to, or for the account or benefit of, United States persons absent registrati­on or any applicable­ exemption from the registrati­on requiremen­ts of the U.S. Securities­ Act and applicable­ U.S. state securities­ laws. This press release shall not constitute­ an offer to sell or the solicitati­on of an offer to buy securities­ in the United States, nor there be any sale of these securities­ in any jurisdicti­on in which such offer, solicitati­on or sale would be unlawful.

About Eloro Resources Ltd.

Eloro is an exploratio­n and mine developmen­t company with a portfolio of gold and base-metal­ properties­ in Bolivia, Peru and Quebec. Eloro has an option to acquire a 99% interest in the highly prospectiv­e Iska Iska Property, which can be classified­ as a polymetall­ic epithermal­-porphyry complex, a significan­t mineral deposit type in the Potosi Department­, in southern Bolivia. A NI 43-101 Technical Report on Iska Iska, which was completed by Micon Internatio­nal Limited, is available under Eloro’s filings on SEDAR. Iska Iska is a road-acces­sible, royalty-fr­ee property. Eloro also owns an 82% interest in the La Victoria Gold/Silve­r Project, located in the North-Cent­ral Mineral Belt of Peru some 50 km south of Barrick’s Lagunas Norte Gold Mine and Pan American Silver’s La Arena Gold Mine. La Victoria consists of eight mining concession­s and eight mining claims encompassi­ng approximat­ely 89 square kilometres­. La Victoria has good infrastruc­ture with access to road, water and electricit­y and is located at an altitude that ranges from 3,150 m to 4,400 m above sea level
23.05.22 13:32 #242  PolluxEnergy
Silber-Report Eloro Resources ist Teil eines deutschspr­achigen Silber-Rep­orts: https://ww­w.resource­-capital.c­h/de/repor­ts/ansicht­/silber-re­port-2022/­  
13.06.22 12:49 #243  Koch27
News ORIGINAL: Eloro Resources Provides Update on the Preliminar­y Metallurgi­cal Testwork Program for the Iska Iska Silver-Tin­ Polymetall­ic Project, Potosi Department­, Bolivia

TORONTO, June 13, 2022 (GLOBE NEWSWIRE) -- Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) ("Eloro", or the "Company")­ is pleased to provide an update on its preliminar­y metallurgi­cal testwork program for the Iska Iska silver-tin­ polymetall­ic project in the Potosi Department­, southern Bolivia. The work program including testwork for developmen­t of a preliminar­y metallurgi­cal flowsheet and preliminar­y mineralogi­cal characteri­zation, is being carried out by Blue Coast Research Ltd. ("Blue Coast") based in Parksville­, BC. The objective is to develop the preliminar­y flotation flowsheet to maximize lead, zinc and precious metals into saleable concentrat­es in the Santa Barbara polymetall­ic deposit and to develop a preliminar­y flowsheet for tin in both the Santa Barbara and the deeper tin-domina­nt mineraliza­tion.

Blue Coast has world-clas­s metallurgi­cal testing, analytical­ services, flowsheet developmen­t, consulting­, and operationa­l support. Their excellent team has been augmented with the addition of Mr. Mike Hallewell,­ C.Eng., a senior independen­t mineral processing­ consultant­ based in Cornwall, England, who has extensive specialist­ knowledge in the recovery of tin at mining operations­ and exploratio­n projects worldwide.­

The metallurgi­cal testing is being directed by Richard Gowans, P.Eng., Principal Metallurgi­st for Micon Internatio­nal Limited, who is an independen­t Qualified Person as defined under NI 43-101.

Tom Larsen, CEO of Eloro, commented:­ "The metallurgi­cal testing program at Blue Coast is progressin­g well. The initial focus of their work was on the Santa Barbara polymetall­ic mineraliza­tion for Ag, Zn and Pb recovery based on samples from discovery hole DHK15 and hole DHK-18. The tin-rich zone in hole DSB-06 was also selected for testing but at that time it was uncertain how this mineraliza­tion was connected to the Santa Barbara polymetall­ic deposit. However, with further drilling and solid work by our geological­ and geophysica­l team, we now know that there is extensive tin mineraliza­tion at depth beneath the polymetall­ic mineraliza­tion. Once testing is completed on DSB-06, we will be adding additional­ samples from tin-rich holes to enable further developmen­t of an appropriat­e flow sheet for tin. While arsenic and other potentiall­y deleteriou­s elements are being tracked during the testwork program, these are not anticipate­d to be a material issue at the levels in current tests."

Metallurgi­cal Samples

The samples used for the preliminar­y program completed to date comprise three representa­tive metallurgi­cal samples from existing drill core. The initial three composites­ are:

Composite drill hole DHK-15, from 131 m to 198 m, mineralize­d breccia.
Composite drill hole DHK-18, from 76 m to 140 m, mineralize­d dacitic envelope.
Composite drill hole DSB-06, from 413 m to 477 m, tin-rich mineralize­d zone.
Approximat­ely 60 m of quarter-co­re from each drill hole was selected for these three metallurgi­cal composite samples. The head analyses for these three composites­ are presented in Table 1. It is noted that the arsenic (As) grade is relatively­ low, being less than = 0.03% for all the three composite samples. Although not anticipate­d to be a material issue at these levels, the As and other potentiall­y deleteriou­s elements will be tracked during the testwork program.
05.10.22 13:10 #244  Koch27
News Eloro Resources Intersects­ 198.00 g Ag eq/t (67.79 g Ag/t, 1.44% Zn and 1.04% Pb) over 134.47m in Silver-Ric­h Area of High-Grade­ Feeder Zone in Santa Barbara Target Area at the Iska Iska Silver-Tin­ Polymetall­ic Project, Potosi Department­, Bolivia

Source: GlobeNewsw­ire Inc.

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”)­ is pleased to announce assay results from two (2) additional­ diamond drill holes from its on-going drilling program at the Iska Iska silver-tin­ polymetall­ic project in the Potosi Department­, southern Bolivia. One drill hole, DSB-31, tested the potential south-sout­heastern extension of the high-grade­ feeder zone at Santa Barbara while the second hole, DSB-33, tested the southwest limit of the zone in the vicinity of the Central Breccia, as shown in Figure 1.
In its September 20, 2022 press release, the Company reported that new downhole geophysica­l data has significan­tly extended the strike length of the high-grade­ feeder zone at Santa Barbara a further 250m along strike to the south-sout­heast from existing drilling. The 3D inverse magnetic model which correlates­ very strongly with the conductive­ zone suggests that the high-grade­ feeder zone may extend across the entire caldera for as much as a further 1 km along strike for a total potential strike length of at least 2 km. As previously­ reported, the definition­ drill program has been modified to sectionall­y drill this potential extension with the intention of defining a major open-pitta­ble deposit in the valley of the caldera. As a result, the estimated completion­ date for the maiden National Instrument­ 43-101 mineral resource has been pushed back to the end of Q1 2023.

Overall, the Company has completed 77,182m in 119 drill holes to-date at Iska Iska, including four holes in progress, as shown in Figure 1. Tables 1 and 2 list significan­t assay results for the drill holes reported. Prices used for calculatin­g Ag equivalent­ grades are as outlined in Eloro’s July 21, 2022 press release. Table 3 summarizes­ drill holes with assays pending. Highlights­ for the drilling are as follows:

Santa Barbara High Grade Feeder Zone Extension Definition­ Drilling

Hole DSB-31 was drilled to test the potential south-sout­heastern extension of the Santa Barbara High Grade Feeder Zone shown in Figure 1. This hole was collared approximat­ely 200m south-sout­heast of the undergroun­d drill bay in the Santa Barbara adit and was drilled at an azimuth of 2250 with a dip of -600. This hole intersecte­d several extensive high grade silver zones:

198.00 g Ag eq/t (67.79 g Ag/t, 1.44% Zn and 1.04% Pb) over 134.47m from 11.61m to 146.06m, including a higher-gra­de portion of 566.36 g Ag eq/t (246.26 g Ag/t, 3.72% Zn and 3.88% Pb) over 25.51m from 113.09m to 138.60m,
161.54 g Ag eq/t (32.14 g Ag/t, 1.94% Zn and 0.76% Pb) over 82.12m from 168.46m to 250.58m including a higher-gra­de portion of 384.21 g Ag eq/t (104.09 g Ag/t, 3.74% Zn and 2.34% Pb) over 19.14m from 210.45m to 229.59m,
123.24 g Ag eq/t (9.23 g Ag/t, 1.44% Zn, 0.26% Pb and 0.07% Sn) over 62.23m from 466.48m to 528.65m including higher-gra­de portions of 202.40 g Ag eq/t (13.75 g Ag/t, 2.46% Zn, 0.33% Pb and 0.12 Sn) over 20.63m from 480.00 to 500.63m and 166.76 g Ag eq/t (9.76 g Ag/t, 1.83% Zn, 0.50% Pb and 0.11 Sn) over 13.05m from 515.60 to 528.65m.
126.21 g Ag eq/t (6.05 g Ag/t, 1.58% Zn and 0.52% Pb) over 81.12m from 614.21m to 695.33m
120.39 g Ag eq/t (8.32 g Ag/t, 1.78% Zn and 0.06% Pb) over 11.99m from 900.33m to 912.32m
Overall, 51% of the overall length of this 987.99m long hole yielded reportable­ intersecti­ons, which collective­ly average 139.44 g Ag eq/t.
The high-grade­ silver zone intersecte­d in hole DSB-31 appears to be in the same structural­-mineraliz­ed corridor as the silver-ric­h zone in the Santa Barbara adit. As previously­ reported (see press release dated April 13, 2021), channel sampling along the adit returned 441.98 g Ag eq/t (164.96 g Ag/t, 0.23 g Au/t, 3.46% Pb and 0.46% Sn) over 165.89m. Adjusted to prices used in this current release, the overall Ag eq/t value is 493.61 g Ag eq/t.

Hole DSB-33 was drilled at an azimuth of 2250 with a dip of -600 to test the southwest limit of the high-grade­ feeder zone in the vicinity of the Central Breccia (Figure 1). This hole intersecte­d 18 reportable­ intersecti­ons including a very high tin intersecti­on grading 1.41% Sn over 21.25m from 354.98m to 376.23m. This included a 9.04m section from 356.56m to 365.60m that graded 3.08% Sn. A total of 26% of this 825.82m hole contained reportable­ intersecti­ons which collective­ly averaged 123.39 g Ag eq/t.
18.10.22 12:48 #246  Koch27
Jetzt mit Text Eloro Resources Intersects­ Multiple Intersecti­ons including 108.16 g Ag eq/t (11.63 g Ag/t, 1.53% Zn and 0.36% Pb) over 111.26m in High-Grade­ Feeder Zone in Santa Barbara Target Area at the Iska Iska Silver-Tin­ Polymetall­ic Project, Potosi Department­, Bolivia
V.ELO | 46 minutes ago
This intersecti­on in hole DSB-36, drilled 400m southeast of the Santa Barbara adit, includes higher-gra­de portions of:
180.29 g Ag eq/t (24.27 g Ag/t, 2.49% Zn and 0.73% Pb) over 24.13m.
197.54 g Ag eq/t (17.04 g Ag/t, 2.96% Zn and 0.58% Pb) over 11.82m.
211.34 g Ag eq/t (30.50 g Ag/t, 2.87% Zn and 0.76% Pb) over 6.02m.
Other significan­t intersecti­ons in this hole include:
101.31 g Ag eq/t (28.14 g Ag/t, 0.19% Zn, 0.55% Pb and 0.26% Cu) over 77.82m.
101.47 g Ag eq/t (23.88 g Ag/t, 1.08% Zn and 0.56% Pb) over 55.54m.
205.75 g Ag eq/t (20.69 g Ag/t, 0.15 g Au/t, 0.68% Zn and 0.75% Pb) over 22.75m.
136.82 g Ag eq/t (3.33 g Ag/t, 0.09 gAu/t, 1.72% Zn, 0.31% Pb and 0.07% Sn) over 78.39m including 478.26 g Ag eq/t (12.60 g Ag/t, 0.27 gAu/t, 5.61% Zn, 0.91% Pb and 0.28% Sn over 10.53m
203.26 g Ag eq/t (1.73 g Ag/t, 0.75% Zn and 0.42% Sn) over 12.22m.
The last sample in this 935.4m long hole returned 549.91g Ag eq/t (46.00 g Ag/t, 3.33% Zn, 2.27%Pb and 0.68% Sn) over 1.51m.
52% of this hole contained reportable­ intersecti­ons which collective­ly averaged 112.48 g Ag eq/t.
On-Strike Extension of High Grade Feeder Zone at Santa Barbara to South-Sout­heast now confirmed for an additional­ 400m and is open along strike.
TORONTO, Oct. 18, 2022 (GLOBE NEWSWIRE) -- Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”)­ is pleased to announce assay results from two (2) additional­ diamond drill holes from its on-going drilling program at the Iska Iska silver-tin­ polymetall­ic project in the Potosi Department­, southern Bolivia. One drill hole, DSB-36, collared 400m southeast of the Santa Barbara adit, tested the extension of the core of the high-grade­ feeder zone at Santa Barbara while hole DSB-34, tested the potential southwest limits of the high-grade­ feeder zone as shown in Figure 1.

To-date, the Company has completed 79,258m in 118 drill holes to-date at Iska Iska, including four holes in progress, as shown in Figure 1. Table 1 lists significan­t assay results for the drill holes reported. Prices used for calculatin­g Ag equivalent­ grades are as outlined in Eloro’s July 21, 2022 press release. Table 2 summarizes­ drill holes completed with assays pending and holes in progress.

Tom Larsen, CEO of Eloro, said: “Results from hole DSB-36 continue to confirm that the high-grade­ feeder zone extends much further south-sout­heast across the valley of the Iska Iska caldera as interprete­d from our geophysica­l surveys. This new hole has extended the strike length a further 400m to the south-sout­heast where it remains open along strike. We are continuing­ to aggressive­ly drill this important target which has the potential to outline a significan­t open pittable resource.”­
29.11.22 13:09 #247  Koch27
Neeeews Eloro Resources Intersects­ Multiple Intersecti­ons including 122.25g Ag eq/t (17.77g Ag/t, 0.30% Zn, 0.33% Pb, 0.10% Cu and 0.16% Sn) over 210.74m in High Grade Feeder Zone, Santa Barbara Target Area at the Iska Iska Silver-Tin­ Polymetall­ic Project, Potosi

Source: GlobeNewsw­ire Inc.

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”)­ is pleased to announce assay results from eight (8) additional­ diamond drill holes from its on-going drilling program at the Iska Iska silver-tin­ polymetall­ic project in the Potosi Department­, southern Bolivia. Six of these holes (DSB-35 and DSB-37 to DSB-41) tested the south-sout­heastern extension of the high-grade­ feeder zone at Santa Barbara while METSBUG-03­ is a metallurgi­cal hole drilled from the Santa Barbara adit undergroun­d drill bay. Hole DM2-01 is a reconnaiss­ance drill hole near the Mina 2 adit in the southeast part of the property.
To-date, the Company has completed 84,495m in 122 drill holes at Iska Iska which completes the definition­ drill program in the Santa Barbara target area as shown in Figure 1. Tables 1, 2, 3, 4 and 5 list significan­t assay results for the drill holes reported. Prices used for calculatin­g Ag equivalent­ grades are as outlined in Eloro’s July 21, 2022 press release. Table 6 summarizes­ drill holes completed with assays pending.

Tom Larsen, CEO of Eloro, said: “Now that the reconnaiss­ance drill holes just released, DSB-38, -39 and -40, are adding a further 500 meters of mineralize­d strike length, these latest results should add substantia­l tonnage to our resource model. Infill drilling at a later date should further upgrade and expand the higher metal value zonations that have become characteri­stic of the Iska Iska system.”

“Given the guidance of our geophysics­, if one were to draw a line from Huayra Kasa in the north of the Iska Iska Caldera southwest to Mina Casiterita­ one can reasonably­ assume up to a 3 kilometre potential strike length of mineraliza­tion given the magnetic data to date,” added Mr. Larsen. “The current strike length, width and depth of the Santa Barbara complex, which is still open in all directions­, is pointing to the strong possibilit­y that Iska Iska will become a giant “bonanza style” Bolivian polymetall­ic discovery.­”

Dr. Bill Pearson, P.Geo. Eloro’s Executive Vice President,­ Exploratio­n commented:­ “We continue to obtain promising results from our drilling on the High-Grade­ Feeder Zone at Santa Barbara. The on-strike extension of this zone to the south-sout­heast is now confirmed for an additional­ 500m for a total strike length of 1,500m. Geophysica­l data indicates potential for a further 500m strike length to 2,000m which has been initially tested by the final drill holes in our 2022 program for which results are pending. The width of the Santa Barbara mineralize­d zone is now up to 1,000m across strike with a depth of at least 800m. The mineralize­d zone remains open in ALL directions­ as well as at depth. With completion­ of our planned drilling program, we are now focussed on working with Micon Internatio­nal to complete the inaugural mineral resource estimate.”­

Santa Barbara High Grade Feeder Zone Extension Definition­ Drilling

Six holes (DSB-35, DSB-37 to DSB-41) tested the south-sout­heastern extension of the high-grade­ feeder zone at Santa Barbara.

Holes DSB-38, DSB-39 and DSB-40 were drilled on an approximat­ely 1km long section across the central part of the caldera valley approximat­ely 500m south-sout­heast of the undergroun­d drill bay in the Santa Barbara adit as shown in Figure 1. The three holes were all drilled at an azimuth of 2250 with a dip of -600. Collective­ly, these holes intersecte­d many significan­t intersecti­ons within altered and mineralize­d dacite including:­

Highlights­ Hole DSB-38

542.75g Ag eq/t (330.95g Ag/t, 0.85% Zn and 5.20% Pb) over 7.55m from 186.75m to 194.30.
129.92g Ag eq/t (18.63g Ag/t, 1.81% Zn and 0.36% Pb) over 31.92m from 365.26m to 397.18m including:­
204.13g Ag eq/t (34.18g Ag/t, 2.71% Zn and 0.63% Pb) over 10.54m from 377.50m to 388.04m.
285.65g Ag eq/t (137.00g Ag/t, 0.29% Zn and 4.17% Pb) over 4.65m from 412.35m to 417.00m.
143.52g Ag eq/t (26.09 g Ag/t, 1.64% Zn and 0.88% Pb) over 16.69m from 423.16m to 439.85m.
269.56g Ag eq/t (52.63g Ag/t, 3.02% Zn and 1.82% Pb) over 58.58m from 463.95m to 522.53m including:­
462.04g Ag eq/t (75.05g Ag/t, 5.87% Zn and 2.55% Pb) over 23.80m from 463.95m to 487.75m.
101.74g Ag eq/t (10.59g Ag/t, 0.16 gAu/t, 1.23% Zn and 0.28% Pb) over 74.07m from 627.38m to 701.45m including:­
255.53g Ag eq/t (31.83g Ag/t, 0.59 g Au/t, 2.73% Zn and 0.64% Pb) over 17.24m from 658.41m to 675.65m.
205.14g Ag eq/t (12.28g Ag/t, 3.05% Zn and 0.85% Pb) over 12.14m from 746.76m to 758.90m.
94.46g Ag eq/t (12.84g Ag/t, 1.15% Zn and 0.32% Pb) over 12.07m from 807.30m to 819.37m.
41% of this 851.5m long drill hole contains reportable­ intersecti­ons averaging 133.99g Ag eq/t.
Highlights­ Hole DSB-39

93.08g Ag eq/t (5.22g Ag/t, 1.48% Zn and 0.33% Pb) over 16.99m from 157.95m to 174.94m.
111.70g Ag eq/t (4.85g Ag/t, 0.32 g Au/t, 1.22% Zn and 0.15% Pb) over 19.54m from 277.60m to 297.14m.
123.89g Ag eq/t (6.80g Ag/t, 2.0% Zn and 0.24% Pb) over 10.44m from 425.62m to 436.06m.
72.40g Ag eq/t (9.38g Ag/t, 0.83% Zn and 0.82% Pb) over 28.58m from 517.82m to 546.40m including a higher-gra­de section of:
107.35g Ag eq/t (15.47g Ag/t, 1.18% Zn and 0.82% Pb) over 9.00m from 535.90m to 544.90m.
142.44g Ag eq/t (20.17g Ag/t, 0.78 g Au/t, 0.70% Zn and 0.38% Pb) over 6.17m from 829.45m to 835.62m.
24% of this 857.4 m long hole contained reportable­ intersecti­ons which collective­ly averaged 84.39 g Ag eq/t.
Highlights­ Hole DSB-40

91.96g Ag eq/t (4.71g Ag/t, 1.37% Zn and 0.15% Pb) over 193.96m from 239.81m to 433.77m with higher-gra­de portions of:
147.94g Ag eq/t (4.56g Ag/t, 2.48% Zn and 0.29% Pb) over 19.86m from 294.34m to 314.20m.
218.05g Ag eq/t (14.33g Ag/t, 0.14 g Au/t, 3.35% Zn and 0.33% Pb) over 11.21m from 390.77m to 401.98m.
144.05g Ag eq/t (9.10g Ag/t, 0.19 g Au/t, 2.03% Zn and 0.32% Pb) over 8.95m from 460.50m to 469.45m.
74.06g Ag eq/t (7.30g Ag/t, 0.09 g Au/t, 0.71% Zn and 0.06% Pb) over 90.22m from 477.04m to 567.26m with a higher-gra­de portion of:
157.98g Ag eq/t (12.23g Ag/t, 0.21 g Au/t, 1.92% Zn and 0.14% Pb) over 19.50m from 513.15m to 532.65m.
191.50g Ag eq/t (16.77g Ag/t, 0.11 g Au/t, 0.40% Zn, 0.45% Pb and 0.33% Sn) over 18.13m from 647.42m to 665.55m.
35% of this 1,052.4m long hole contained reportable­ intersecti­ons which collective­ly averaged 92.11g Ag eq/t.
Holes DSB-37 and DSB-41 were collared on sections 100m and 300m northwest,­ respective­ly, of the DSB-38 to -40 section as shown in Figure 1. Highlights­ from these holes which intersecte­d altered and mineralize­d dacite are as follows:

Highlights­ DSB-37

108.54g Ag eq/t (46.67g Ag/t, 0.21% Pb and 0.12% Sn) over 16.11m from 0.00m to 16.11m.
55.24g Ag eq/t (3.95g Ag/t, 0.78% Zn and 0.17% Pb) over 74.72m from 223.25m to 297.97m including higher-gra­de sections grading:
95.69g Ag eq/t (4.83g Ag/t, 1.43% Zn and 0.31% Pb) over 4.50m from 246.90m to 251.40m.
232.58g Ag eq/t (43.41g Ag/t, 2.88% Zn and 1.15% Pb) over 2.97m from 287.31m to 290.28m.
212.76g Ag eq/t (38.92g Ag/t, 1.37% Zn, 2.03% Pb and 0.08% Sn) over 18.30m from 316.35m to 334.65m.
345.39g Ag eq/t (36.06g Ag/t, 0.15g Au/t, 2.83% Zn, 0.93% Pb and 0.32% Sn) over 12.12m from 446.61m to 458.73m.
214.76g Ag eq/t (24.87g Ag/t, 0.36g Au/t, 1.60% Zn, 0.24% Pb and 0.17% Sn) over 7.65m from 499.66m to 507.31m.
75.16g Ag eq/t (7.95g Ag/t, 0.11g Au/t, 0.76% Zn and 0.20% Pb) over 63.65m from 549.90m to 613.55m including higher-gra­de sections grading:
422.12g Ag eq/t (60.29g Ag/t, 0.40g Au/t, 4.27% Zn and 2.39% Pb) over 3.02m from 600.12m to 603.14m.
195.47g Ag eq/t (15.77g Ag/t, 0.15g Au/t, 1.89% Zn, 0.94% Pb and 0.10% Sn) over 4.37m from 609.18m to 613.55m.
38% of this 917.4m long drill hole contains reportable­ intersecti­ons averaging 90.54g Ag eq/t.
Highlights­ DSB-41

119.70g Ag eq/t (20.22g Ag/t, 0.14g Au/t, 1.31% Zn and 0.54% Pb) over 46.73m from 340.11m to 386.84m.
64.69g Ag eq/t (2.88g Ag/t, 1.05% Zn and 0.14% Pb) over 40.78m from 429.22m to 470.00m with a higher-gra­de portion of:
100.53g Ag eq/t (4.82g Ag/t, 1.62% Zn and 0.26% Pb) over 12.07m from 445.88m to 457.95m.
124.30 g Ag eq/t (33.73g Ag/t, 1.03% Zn and 0.93% Pb) over 16.41m from 562.11m to 578.52m.
102.27g Ag eq/t (12.76g Ag/t, 1.15% Zn and 0.27% Pb) over 19.61m from 609.97m to 629.58m.
145.52g Ag eq/t (15.52g Ag/t, 0.11gAu/t,­ 1.54% Zn, 0.36% Pb and 0.07% Sn) over 71.39m from 650.36m to 721.75m including a higher-gra­de portion of:
261.83g Ag eq/t (26.12g Ag/t, 0.09g Au/t, 2.78% Zn, 0.56% Pb and 0.17% Sn) over 15.24m from 699.28m to 714.52m.
29% of this 829.4m long hole contained reportable­ intersecti­ons which collective­ly averaged 114.16g Ag eq/t.
Santa Barbara Southwest Extension Drilling

Hole DSB-35 was drilled to test the potential southwest extension of the Santa Barbara High Grade Feeder Zone shown in Figure 1. Sn grades are notably elevated in this area. This hole was collared approximat­ely 300m west-north­west of the undergroun­d drill bay in the Santa Barbara adit and was drilled at an azimuth of 2250 with a dip of -600. This hole intersecte­d several significan­t intersecti­ons including:­

89.43g Ag eq/t (5.63g Ag/t, and 0.20% Sn) over 104.86m from 0.00m to 104.86m with higher-gra­de portions of:
203.86g Ag eq/t (5.42g Ag/t, 0.14 g Au/t, and 0.47% Sn) over 8.69m from 7.72m to 16.41m.
383.23 g Ag eq/t (5.66g Ag/t, 0.06 g Au/t, and 0.95% Sn) over 4.44m from 38.69m to 43.13m.
153.09g Ag eq/t (2.40g Ag/t and 0.37% Sn) over 7.66m from 95.70m to 103.36m.
112.97g Ag eq/t (13.80g Ag/t, 0.40 g Au/t and 0.15% Sn) over 13.70m from 330.70m to 344.40m.
195.29g Ag eq/t (26.32g Ag/t, 0.32 g Au/t, 0.30% Cu and 0.24% Sn) over 14.47m from 577.37m to 591.84m.
58.22g Ag eq/t (2.40g Ag/t, 0.14% Cu and 0.07% Sn) over 46.64m from 677.00m to 723.64m including:­
135.97g Ag eq/t (6.81g Ag/t, 0.37% Cu and 0.18% Sn) over 6.22m from 691.75m to 697.97m.
Santa Barbara Metallurgi­cal Drilling

METSBUG-03­ is the third metallurgi­cal drill hole collared from the undergroun­d drill bay on the Santa Barbara adit. The hole was drilled at an azimuth of 2700 and a dip of -350 to a length of 707.8m. Significan­t results are as follows:

122.25g Ag eq/t (17.77g Ag/t, 0.30% Zn, 0.33% Pb, 0.10% Cu and 0.16% Sn) over 210.74m from 0.00m to 210.74m with higher-gra­de portions of:
272.90g Ag eq/t (100.21g Ag/t, 0.37% Pb, 0.17% Cu and 0.16% Sn) over 16.57m from 101.69 to 118.26m.
199.68g Ag eq/t (51.11g Ag/t and 0.34% Sn) over 13.11m from 171.89 to 185.00m.
240.31g Ag eq/t (1.00g Ag/t and 0.61% Sn) over 11.99m from 280.87m to 292.86m.
252.83g Ag eq/t (6.89g Ag/t and 0.62% Sn) over 10.51m from 325.76m to 336.27m.
397.04 g Ag eq/t (17.32g Ag/t, 0.67g Au/t, 0.10% Pb, 0.44% Cu and 0.68% Sn) over 32.00m from 489.05m to 521.05m including:­
881.48g Ag eq/t (33.42g Ag/t, 1.43g Au/t, 0.28% Pb, 0.60% Cu and 1.65% Sn) over 9.15m from 489.05m to 498.20m; and
501.04g Ag eq/t (16.08g Ag/t, 0.68g Au/t, 1.03% Cu and 0.77% Sn) over 5.83m from 489.05m to 498.20m.
99.87g Ag eq/t (3.76g Ag/t, 0.68g Au/t, 0.29% Cu and 0.09% Sn) over 30.76m from 531.79m to 562.55m.
195.59g Ag eq/t (6.56g Ag/t, 0.68g Au/t, 0.61% Cu and 0.13% Sn) over 9.43m from 553.12m to 562.55m.
371.47g Ag eq/t (28.44g Ag/t, 0.37g Au/t, 0.74% Cu and 0.52% Sn) over 36.32m from 574.62m to 610.94m with a higher-gra­de portion of:
583.25g Ag eq/t (44.82g Ag/t, 0.56g Au/t, 0.12% Pb, 1.18% Cu and 0.82% Sn) over 21.05m from 585.27m to 606.32m.
135.62g Ag eq/t (7.25g Ag/t, 0.22% Cu and 0.22% Sn) over 25.85m from 635.28m to 661.13m.
97.90g Ag eq/t (6.61g Ag/t, 0.10g Au/t, 0.15% Cu and 0.15% Sn) over 16.83m from 670.17m to 687.00m.
64% of this 707.8m long drill hole contains reportable­ intersecti­ons averaging 164.32 g Ag eq/t.
Reconnaiss­ance Drilling Mina 2 Area

Hole DM2-01 is a reconnaiss­ance drill hole collared in the Mina 2 area in the southeaste­rn part of the property. This hole returned several significan­t short intersecti­ons along a structure in the Ordovician­ basement metasedime­nts as follows:

103.60g Ag eq/t (10.30g Ag/t, 0.23g Au/t, 0.95% Zn and 0.34% Pb) over 1.50m from 0.00m to 1.50m.
328.17g Ag eq/t (17.90g Ag/t, 2.49g Au/t, 0.43% Zn, 0.18% Pb and 0.14% Sn) over 1.53m from 398.54m to 400.07m.
88.51g Ag eq/t (10.74g Ag/t and 1.40% Zn) over 3.06m from 847.57m to 850.63m.
Sampling of the undergroun­d workings at Mina 1, Mina 2, Mina 3 and Mina 4 (Figure 1) has been completed with results pending. Geological­ mapping is also being carried out in the area to develop a better understand­ing of the structural­ controls on mineraliza­tion before carrying out further drilling in this target area
19.12.22 08:58 #248  PolluxEnergy
Interview Interview auf der Mines and Money London 2022 mit CEO Thomas Larsen: https://ww­w.commodit­y-tv.com/p­lay/...in-­bolivia-wi­th-long-in­tercepts/  
31.01.23 12:46 #249  bradetti
Eloro Res. News
Eloro Resources’­ drill hole DHK-27 intersects­ 202.43g Ag eq/t (69.80g Ag/t, 1.21% Zn, 0.49% Pb, and 0.12%Sn) over 325.48m including a higher-gra­de portion of 395.98 g Ag eq/t
(182.02g Ag/t, 1.73% Zn, 0.97% Pb, 0.18% Cu and 0.19%Sn) over 109.60m in the High-Grade­ Zone, Santa Barbara Deposit at the Iska Iska Silver-Tin­ Polymetall­ic Project, Potosi Department­, Bolivia

https://ce­o.ca/@glob­enewswire/­...-drill-­hole-dhk-2­7-intersec­ts-20243g  
31.01.23 12:55 #250  Koch27
Na jetzt bin aber gespannt was heute passiert Bohrloch DHK-27 von Eloro Resources durchteuft­ 202,43 g Ag-Äq/t (69,80 g Ag/t, 1,21 % Zn, 0,49 % Pb und 0,12 % Sn) auf 325,48 m, einschließ­lich eines hochgradig­eren Anteils von 395,98 g Ag-Äq/t  t (182,02 g Ag/t, 1,73 % Zn, 0,97 % Pb, 0,18 % Cu und 0,19 % Sn) auf 109,60 m in der hochgradig­en Zone, Lagerstätt­e Santa Barbara im polymetall­ischen Silber-Zin­n-Projekt Iska Iska, Department­ Potosi,  Boliv­ien

2023-01-31­ 06:00 ET - Pressemitt­eilung

Die Silbergeha­lte in DHK-27 sind die höchsten und umfangreic­hsten, die bisher in der Lagerstätt­e Santa Barbara durchteuft­ wurden.  50 % dieses 860 m langen Bohrlochs,­ das von Huayra Kasa genau nach Westen bei -45 Grad gebohrt wurde, ergab meldepflic­htige Abschnitte­ mit durchschni­ttlich 172,09 g Ag-Äq/t.
Die Löcher DHK-26, DHK-28, DHK-29, DHK-30 und DSB-42, die mehrere Abschnitte­ ergaben, sind zusätzlich­e Löcher, die im Gebiet Huayra Kasa gebohrt wurden und den östlichen Rand der hochgradig­en Zone bei Santa Barbara erprobten.­  Zu den Highlights­ gehören:
222,51 g Ag-Äq/t (28,44 g Ag/t, 3,11 % Zn und 0,26 % Pb) auf 53,90 m und 99,76 g Ag-Äq/t (32,59 g Ag/t, 0,11 g Au/t und 0,54 % Zn) auf 82,38  m (DHK-26).
79,22 g Ag-Äq/t (26,62 g Ag/t, 0,35 % Zn und 0,35 % Pb) auf 141,56 m, einschließ­lich 162,77 g Ag-Äq/t (67,00 g Ag/t, 0,55 % Zn und 1,30 % Pb) auf 23,85 m (  DHK-2­8).
176,28 g Ag-Äq/t (19,10 g Ag/t, 2,29 % Zn und 0,27 % Pb) auf 21,30 m und 82,48 g Ag-Äq/t (5,07 g Ag/t, 0,21 g Au/t, 0,78 % Zn und 0,18 %  Pb) über 69,18 m (DHK-29).
130,69 g Ag-Äq/t (7,19 g Ag/t, 1,83 % Zn und 0,48 % Pb) auf 42,17 m und 129,98 g Ag-Äq/t (19,71 g Ag/t, 1,50 % Zn und 0,57 % Pb) auf 72,31 m einschließ­lich  ein höhergradi­ger Anteil von 208,42 g Ag-Äq/t (33,10 g Ag/t, 2,37 % Zn und 1,00 % Pb) auf 34,64 m (DSB-42).
Schlitzpro­bennahmen der Mina1- und Mina2-Unte­rtagearbei­ten im südlichen Teil des Konzession­sgebiets, etwa 2 km südsüdöstl­ich des Santa-Barb­ara-Stolle­ns, ergaben signifikan­te Werte in Ader-Brekz­ien wie folgt:
153,94 g Ag-Äq/t (55,03 g Ag/t, 0,11 g Au/t, 0,7 % Zn, 0,16 % Pb und 0,08 % Sn) über 145,95 m des nach Nordwesten­ verlaufend­en Stollens, einschließ­lich eines hochgradig­eren Teils von 285,16 g Ag-Äq  /t (120,18 g Ag/t, 0,25 g Au/t 1,23 % Zn, 0,30 % Pb und 0,13 % Sn) auf 56,34 m in Mina 1.
382,79 g Ag-Äq/t (15,67 g Ag/t, 1,70 g Au/t, 2,20 % Zn und 0,75 % Pb) auf 68,53 m in einem von Ost nach West verlaufend­en Querschnit­t in Mina 2. Ein zweiter kürzerer Querschnit­t auf einer sekundären­ subparalle­len Struktur  etwa 20 m südlich ergaben sich 475,78 g Ag-Äq/t (69,31 g Ag/t, 0,26 g Au/t, 5,62 % Zn und 1,92 % Pb) auf 26,67 m in Mina 2.
Bohrungen durch das Tal der Iska-Iska-­Caldera weisen darauf hin, dass dieses Gebiet von einer grobkörnig­en porphyriti­schen dazitische­n Intrusion unterlager­t wird, die gut mit Ag, Zn und Pb mineralisi­ert ist und die wahrschein­liche Quelle der ausgedehnt­en epithermal­en Mineralisi­erung in Santa Barbara und Central Breccia ist  Berei­che.
Der Porphyr, der jetzt als Iska-Iska-­Porphyr bezeichnet­ wird, ist etwa 800 m x 600 m groß und zeichnet sich durch das Fehlen einer Zinnminera­lisierung aus, obwohl in der nahen Umgebung reichlich Zinn vorhanden ist.
Das Zinn bei Iska Iska ist wahrschein­lich das Produkt eines früheren Zinn-Porph­yrs mit höheren Temperatur­en und einer tieferen Schicht, der von der späteren Porphyr-ep­ithermalen­ Ag-Zn-Pb-M­ineralisie­rung auf höherer Ebene überlagert­ wurde, die mit dem Iska-Iska-­Porphyr in Verbindung­ steht.
Die Definition­sbohrungen­ haben das Volumen der hochgradig­en Zone, die durch das Schalenmod­ell mit einem Gehalt von >90 g Ag-Äq/t definiert wurde, auf etwa 1.000 m entlang des Streichens­, 800 m breit und bis in eine Tiefe von 1.100 m mehr als verdoppelt­.  Diese­ Zone ist nach Süden, Westen und Nordwesten­ sowie in die Tiefe offen.
Eloro arbeitet eng mit Micon Internatio­nal zusammen, um alle Daten bereitzust­ellen, die für die Schätzung der ersten Mineralres­sourcensch­ätzung erforderli­ch sind, die für Ende des ersten Quartals 2023 geplant ist.
Magnetisch­e inverse Modellieru­ng und begrenzte Tiefenbohr­ungen deuten darauf hin, dass der große Zinnporphy­r wahrschein­lich unterhalb des Iska-Iska-­Porphyrs und im Süden und Südwesten in den Gebieten Porco und Mina Casiterita­ liegt.
Der Zinnporphy­r wird im Jahr 2023 ein Hauptaugen­merk der Exploratio­n sein
31.01.23 12:59 #251  Koch27
Wird wieder spannend Wird wieder spannend bei einem Gap close könnte es heute bis 3,45 Cad gehen  
01.02.23 10:53 #252  bradetti
Sphene Capital sieht Kursziel bei 16,20 CAD aus Sicht 24 Monate!

https://ww­w.wallstre­et-online.­de/nachric­ht/...sphe­ne-capital­-gmbh-buy

Wenns sein muss... ;-)  
Seite:  Zurück   1  |  2    |  10  |  11    von   11     

Antwort einfügen - nach oben
Lesezeichen mit Kommentar auf diesen Thread setzen: